Commissioned directly by Morpeth School, the classrooms provides over 2,500sq ft of valuable extra space linked by a decked walkway.
Located within the existing school grounds, the unit was craned in over half term to minimise disruption for the pupils and was painted in a vibrant red colour to reflect the creative nature of their use.
INFORMATION
Completion date: Nov 2007
Installation time: 4 days
Architect: London Space Management Ltd
Engineer: Furness Engineering
Client: Morpeth School
Location: Portman Place, London E2
Units created: 4
Total Space created: 2,560 sq ft.
Use: Classrooms
Installation time: 4 days
Architect: London Space Management Ltd
Engineer: Furness Engineering
Client: Morpeth School
Location: Portman Place, London E2
Units created: 4
Total Space created: 2,560 sq ft.
Use: Classrooms