Commissioned by Cuffley School, the classroom and music studios provide over 800sq ft of valuable extra space, linked to the existing building by an innovative covered walkway.
Located on the outskirts of North London, the building was craned in in just one day during half term to minimise disruption, and was painted in striking green and orange to reflect the vibrant and creative nature of their use.
INFORMATION
Completed: Oct 2008
Installation time: 1 day
Architect: London Borough Tower Hamlets
Design/Manufacturer: Urban Space Management Ltd
Location: Cuffly,Herts EN6
Units created: 3
Total Space created: 800 sq ft
Use: Classroom and music studios
Installation time: 1 day
Architect: London Borough Tower Hamlets
Design/Manufacturer: Urban Space Management Ltd
Location: Cuffly,Herts EN6
Units created: 3
Total Space created: 800 sq ft
Use: Classroom and music studios
0 comments
Post a Comment