Situated on former wasteland, the new marketing suite was designed to fit within a larger community that is being developed along 2 kilometres of Thames waterfront in Barking and Dagenham.
Commissioned by Barking Riverside, the project has been designed with the environment in mind. Wind turbines, solar panels, biomass heater and re used structure ensure the projects very low carbon footprint and sustainable high performance during its life cycle.
The impressive decked terrace, canopy and sleek silver lines give the building a modern, innovative design that will compliment the future development.
INFORMATION
Completed: 2008
Installation time: 3 days
Architect: London Borough Tower Hamlets
Engineer: Furness Engineering
Developer: Urban Space Management Ltd
Location: Barking Riverside,Essex
Units created: 5
Total Space created: 3,840 sq. ft. internal space, 960 sq. ft terraced external space
Use: Marketing Suite
Installation time: 3 days
Architect: London Borough Tower Hamlets
Engineer: Furness Engineering
Developer: Urban Space Management Ltd
Location: Barking Riverside,Essex
Units created: 5
Total Space created: 3,840 sq. ft. internal space, 960 sq. ft terraced external space
Use: Marketing Suite
1 Comment
Here's how to cut your power bill by 75%:
Want to know how to easily produce all of the renewable energy you could ever want right at home?
And you’ll be able to make your home totally immune from power failures, blackouts, and energy grid failures…
so even if everyone else in your area (or even the whole country) loses power…you won’t.
READ MORE: DIY HOME ENERGY
Posted on September 10, 2016 at 10:08 AM
Post a Comment